CAT A Fit Out

Transforms shell and core spaces into clean, compliant bases with essential services and neutral finishes, ready for fast, disruption – free installation

CAT A Fit Out — Scope of Work

Raised Floors & Suspended Ceilings

Raised access flooring with cable management and fire-rated suspended ceilings for acoustic performance. Clear zoning for partitions and future services.

Mechanical & HVAC

Energy-efficient HVAC sized to layout for comfort and air quality. Includes ductwork, airflow balancing, and smart controls.

Electrical & Lighting

Compliant electrical systems with main boards, LED lighting, and emergency illumination. Designed for reliability and reduced running costs.

Fire, Life-Safety & Security Pre-Provision

Fire alarm interfaces, prewired access for security, and routing for CCTV or sensors. Installed to comply with UK safety standards.

Core Finishes & Circulation Zones

Durable wall finishes, clean lobbies, and high- traffic flooring. Surfaces prepared for future decoration.

Service Documentation & Compliance

As-built MEP drawings, test reports, and O&M manuals for smooth handover and regulatory compliance.

Treem Build delivers CAT A fit outs that provide a ready-to-use, professional base complete with commissioned MEP infrastructure, compliant life safety, and neat finishes. Designed for flexibility, our approach protects key services and creates a strong foundation for future fit outs.

CAT A Fit Out — Process Overview
1
Project Brief & Site Audit
Conduct a detailed CAT A site inspection, reviewing structure, risers, and drawings to align objectives, compliance, and timelines with all stakeholders.
2
Design Coordination & Risk Planning
Coordinate MEP, fire safety, and structural layouts with clash detection. Confirm compliance routes early to protect budgets and schedules.
3
Service Strategy & Load Modelling
Define HVAC, electrical, and fire safety requirements. Select energy-efficient systems for performance, cost control, and long-term reliability.
4
Technical Design & Documentation
Produce BIM-coordinated layouts and installation-ready plans for ceilings, floors, and service zones.
5
Procurement & Quality Approval
Approve vendors, materials, and specifications. Lock delivery schedules to ensure smooth progress.
6
Base Finishes
Install raised floors, suspended ceilings, and prepare core finishes to receive services.
7
Core Services Installation
Install HVAC, lighting grids, electrical distribution, and fire safety systems. Ensure neat, labelled, and compliant routing.
8
Testing & Certification
Commission all MEP and life-safety systems to UK standards. Provide test results and compliance certificates.
9
Final Handover
Deliver a base-ready, compliant CAT A space with as-built drawings, O&M manuals, and asset schedules.
Treem CTA — Option 2

Need expert help with your fit-out project?

Let's start a conversation.

Book a Discovery Call ›

Spaces that we can do

Edit Template
Edit Template